Fairmilehead Phase 2 - Contact Centre

Calendar
December 6, 2018
Sector:
This is some text inside of a div block.

Fairmilehead Phase 2 - Contact Centre

Appointed principal contractor, our task was to undertake the full building refurbishment of Scottish Water Head Office in Fairmilehead, Edinburgh.

Phase 2 of our prestigious (8 Phase) refurbishment project for Scottish Water main Head office in Edinburgh. R&A met another key milestone in the delivery and relocation of the FMH office refurbishment project with the successful upgrade and relocation of SW’s 24/7 contact centre at the end of August 2017.

This phase of the project required working in very close partnership with all the relevant stakeholders involved in the works including the Property Management Capital Projects Team.

The move of this business critical facility into space fully upgraded to meet the needs of Scottish Water people dealing with round the clock enquiries from their customers took place in a seamless transition with no disruption to service.

The new location for the contact centre is on the north wing and includes 90 desks, project space, a new training and backup (secure ICC) room, canteen, meeting room, muster area, breakout areas, toilets and a fully agile working environment. The extended seating capacity allows for ramping up and down during incidents.

The modern design has exposed ceilings showcasing galvanised steel duct work, AC units, LED lighting within acoustic rafts, exposed original concrete roof slabs, corrugated steel roof and structural steelwork.

The new contact centre creates an acoustic environment within an open plan office with the use of screens and acoustic furniture products like quiet meeting pods which are flexible and can be easily repositioned.

The office layout is also Disability Discrimination Act compliant with height adjustable desks, wide walkways, automatic doors, disabled toilets, lift, etc.

  • Fairmilehead Phase 2 – Contact Centre Relocation – Edinburgh
  • Client – Scottish Water
  • Architect – Keppie Design
  • Consultant – RSP Consulting Engineers LLP
  • Value – £750K

Fairmilehead Phase 2 - Contact Centre Relocation
Fairmilehead Phase 2 - Contact Centre Relocation
Fairmilehead Phase 2 - Contact Centre Relocation

Other Case Studies

News One Images
Arrow Right
Calendar
June 25, 2025
Enoch Hill Wind Farm

Multi-disciplinary installation of electrical, fire, security and HVAC systems at Enoch Hill Wind Farm substation.

View More
Arrow Right GreenArrow Right Green
News One Images
Arrow Right
Calendar
May 22, 2025
Peterhead Waste Water Treatment Works

Installation of a Kempower EV charger with full civils, power supply and surge protection integration.

View More
Arrow Right GreenArrow Right Green
News One Images
Arrow Right
Calendar
August 30, 2024
Alloa Waste Water Treatment Works

Design, supply and installation of a 950kW Solar PV system with ground-mounted array and Fronius inverter technology.

View More
Arrow Right GreenArrow Right Green