Galafoot Water Depot - Galashiels

Calendar
November 14, 2018
Sector:
This is some text inside of a div block.

Galafoot Water Depot - Galashiels

Building on our relationship with Scottish Water to upgrade their Depot Facility in Galashiels
Appointed principal contractor in July 2018 our task was to undertake the building refurbishment of their Galafoot Depot Facility in Galashiels.

The works involved the initial relocation and set up of staff to another part of the campus followed by a full building refurbishment incorporating the following elements.

  • Electrical Rewire
  • AC Installation
  • Mechanical & Plumbing Works
  • Ventilation Works
  • Fire and Security
  • Door Access
  • Network & Fibre Optic Infrastructure
  • Toilet Fit Out
  • Kitchen and Tea Prep Points
  • Floor Coverings
  • Bespoke Joinery Items
  • External Civil Works
  • External and Internal Signage
  • Furniture and Storage

The location of this project as part of the Waste Water Treatment Works presented various challenges that had to be overcome. An existing comms room and fibre infrastructure that required to be kept live at all times with access to Scottish Water staff resulted in us working closely with their on-site operational team. Our in house understanding of their systems and processes allowed us to successfully manage this issue during the implementation of the project.

12 weeks after commencing on site the project was completed on time allowing staff to relocate into a new modern office and operational area.

  • Galafoot Water Depot – Galashiels
  • Client – Scottish Water
  • Architect – Keppie Design
  • Consultant – RSP Consulting Engineers LLP
  • Value – £350K

R&A focus on working in partnership with our clients to provide appropriate solutions, utilising our own workforce & long-term service providers to meet the demands of varied project requirements.

Galafoot Water Depot - Galashiels
Galafoot Water Depot - Galashiels
Galafoot Water Depot - Galashiels

Other Case Studies

News One Images
Arrow Right
Calendar
June 25, 2025
Enoch Hill Wind Farm

Multi-disciplinary installation of electrical, fire, security and HVAC systems at Enoch Hill Wind Farm substation.

View More
Arrow Right GreenArrow Right Green
News One Images
Arrow Right
Calendar
May 22, 2025
Peterhead Waste Water Treatment Works

Installation of a Kempower EV charger with full civils, power supply and surge protection integration.

View More
Arrow Right GreenArrow Right Green
News One Images
Arrow Right
Calendar
August 30, 2024
Alloa Waste Water Treatment Works

Design, supply and installation of a 950kW Solar PV system with ground-mounted array and Fronius inverter technology.

View More
Arrow Right GreenArrow Right Green