Whinhill WPS to Dougliehill High DSR

Calendar
October 26, 2018
Sector:
This is some text inside of a div block.

Whinhill WPS to Dougliehill High DSR

Electrical Services were requested to carry out installation of fibre-optic cabling requirements to link an existing water pumping station to an existing service reservoir pumping station, thus allowing the de-commission from service of two further pumping stations located between both sites.

This project required the installation of 10,000 metres of SWA OS2 grade fibre-optic cable fully within ground ducted systems inclusive of full termination via multiple IP68 fibre-optic junction boxes. These works were carried out through very demanding terrain over various sections of farm-land, main carriageways & housing estate street networks.

This project required working in very close partnership with all the relevant stakeholders due to multiple road traffic controls required. R&A appointed a specialist cabling installer to assist in minimising required road closures through-out the project. We also appointed a specialist fibre-optic engineer to assist in the final testing & certification of these works, due to the increased cable lengths & multiple number cable-joints required through-out the installation.

This project proved to be a major success, achieved through a basis of teamwork & a determination to hand-over an operational system to our client, which would not have been achievable with-out these qualities.

  • Client – Ferrier Pumps
  • Main Contractor – Caledonian Water Alliance
  • Utility Provider – Scottish Water
  • Value – £90K
  • Dates – Feb-May 2018

R&A focus on working in partnership with our clients to provide appropriate solutions, utilising our own workforce & long-term service providers to meet the demands of varied project requirements.

Other Case Studies

News One Images
Arrow Right
Calendar
June 25, 2025
Enoch Hill Wind Farm

Multi-disciplinary installation of electrical, fire, security and HVAC systems at Enoch Hill Wind Farm substation.

View More
Arrow Right GreenArrow Right Green
News One Images
Arrow Right
Calendar
May 22, 2025
Peterhead Waste Water Treatment Works

Installation of a Kempower EV charger with full civils, power supply and surge protection integration.

View More
Arrow Right GreenArrow Right Green
News One Images
Arrow Right
Calendar
August 30, 2024
Alloa Waste Water Treatment Works

Design, supply and installation of a 950kW Solar PV system with ground-mounted array and Fronius inverter technology.

View More
Arrow Right GreenArrow Right Green