Latest Projects & Case Studies
R&A Group Ltd

Solar PV

The case studies below highlight how R&A Group have completed a range of challenges, displaying a wealth of expertise and experience.

News One Images
Arrow Right
Calendar
August 30, 2024
Sector:
This is some text inside of a div block.

Alloa Waste Water Treatment Works

Design, supply and installation of a 950kW Solar PV system with ground-mounted array and Fronius inverter technology.

View More
Arrow Right GreenArrow Right Green
News One Images
Arrow Right
Calendar
October 31, 2023
Sector:
This is some text inside of a div block.

Winchburgh Waste Water Treatment Works

Design, supply and installation of a 53kW Solar PV system with remote monitoring, optimisers and roof-mounted PV array.

View More
Arrow Right GreenArrow Right Green
News One Images
Arrow Right
Calendar
June 13, 2018
Sector:
This is some text inside of a div block.

Kelty Primary School Fife PV installation

R&A Group undertook the PV installation project for Kelty Primary School located in Fife. The project cost £35,000 for 45Kw PV Installation.

View More
Arrow Right GreenArrow Right Green

Other Case Studies

News One Images
Arrow Right
suitecase
June 25, 2025
Enoch Hill Wind Farm

Multi-disciplinary installation of electrical, fire, security and HVAC systems at Enoch Hill Wind Farm substation.

View More
arrowarrow
News One Images
Arrow Right
suitecase
May 22, 2025
Peterhead Waste Water Treatment Works

Installation of a Kempower EV charger with full civils, power supply and surge protection integration.

View More
arrowarrow
News One Images
Arrow Right
suitecase
August 30, 2024
Alloa Waste Water Treatment Works

Design, supply and installation of a 950kW Solar PV system with ground-mounted array and Fronius inverter technology.

View More
arrowarrow